Back to Project Portfolio
Commercial & Retail
New Dual Food Facility: Arby's & Burger King
Design, cost-estimating, and engineering consultation for a dual-brand food facility at Kadena Air Base, including commercial-kitchen exhaust, grease management, HVAC coordination, vehicular circulation, and drive-through lanes.

Engineering Scope
Coordinated technical deliverables
The project scope brought the listed disciplines into a coordinated design package aligned with the facility’s operational requirements and project program.
- Commercial Kitchen MEP & Hood Exhaust
- Civil Traffic & Drive-Through Circulation
- Detailed Quantity & Cost Estimates
- U.S. Military Base Standards Coordination
Planning a similar project?
Share the location, scope, schedule, and available reference documents for an initial technical review.
